How Should a Plastic Granulator Machine Record Yield from PP Runner Scrap?

Views: 0     Author: Site Editor     Publish Time: 2026-11-07      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Gross output tells you how much material came out. Yield tells you how much passed inspection.

For a plastic granulator machine, divide the net weight of approved PP regrind by the net weight of runners fed.

Track fines, held material, and any unexplained difference separately.

Define the Batch Before Weighing

Start with one traceable lot of polypropylene (PP) runners from injection molding. Record the press or mold ID, resin grade, color, lot number, and collection time. Keep runners apart from purgings, floor sweepings, and unidentified plastics. If you include sprues from the same molding job, say so in the record. This keeps a runner-only trial comparable with later runs.

Tare each container and record the incoming scrap weight. Weigh anything removed during sorting and any runners returned unprocessed. Enter the net weight actually fed into the plastic crusher machine as the denominator for granulation yield. Begin and end at a verified empty condition when practical. If known material from the same lot remains in the hopper or conveyor, record its mass as opening or closing inventory.

plastic crusher machine

Choose the Measurement Boundary

Decide whether the report starts at receiving, at the feed hopper, or at a specific press. An incoming-lot report starts with all the scrap received and includes the material removed during sorting. A machine trial usually starts with the net weight fed. A press-side report may also track the weight of regrind sent to a blender. Put the starting and ending points on the first line of the report. Name each percentage according to the boundary used.

In a closed-loop cell, fresh runners may return to the press as regrind within the same shift. Count them at the granulator feed point when measuring machine workload. For a recovery report on a single lot, keep the original lot weight as the denominator and track repeat handling separately. Agree on where the measurement occurs when the same material can cross that point twice. If your system cannot weigh one stream directly, identify the estimated value and how it was obtained. Do not substitute shift averages for a measured trial result. Make sure that the weights recorded at receiving, the plastic granulator machine, and the blender refer to clearly identified batches. Material that moves across midnight or between shifts should retain its original lot reference.

Record Each Output by Disposition

Weigh the main regrind, separately collected fines, oversize held for another pass, and any material recovered during cleanout. Record samples removed for quality testing. If you already weighed a bin before taking a sample, deduct the sample before entering it separately. Use the same weighing points for every run. For direct feed to a blender, use a verified weight measurement before blending or run a separate collection trial.

Release regrind against the agreed criteria for its next use. Common runner regrind checks include material identity, particle size, fines, and visible contamination. If a lot is waiting for inspection, enter it as held material until the result arrives. If your plant also crushes PP sheet on a plastic sheet crusher, keep that output under its own job and material code. A shared resin name gives limited information about grade, additives, and reuse eligibility.

Decide Which Regrind Qualifies for Reuse

Set the acceptance criteria before the run. Ask the molding team which PP grades can receive the regrind and which jobs require a separate approval. Record permitted color, visible contamination, and the sieve method or flake range. If the job calls for additional checks, write down how the lot is sampled and who releases it. This gives the operator a clear way to decide whether a bin belongs under approved output or quality hold.

Consider material from a changeover separately. A new color, different filler content, or a resin change can affect where the recovered flakes may be used. Assign a separate container to start-up output until the quality team identifies its disposition. If the first bin includes material from a previous lot, record the carryover or keep the bin on hold. A weigh ticket documents how much was collected. The release record documents where it may go. Keep both documents linked to the batch, especially if the decision arrives after the run ends. If material qualifies only for a different molding job, record that destination and use the original trial criteria when calculating yield for the requested application. This keeps results comparable across orders.

Calculate Yield and Reconcile the Weights

Approved regrind yield (%) = net approved regrind ÷ net runner scrap fed × 100

In this example, a trial receives 104.0 kg of scrap. Sorting removes 4.0 kg before feeding. The granulator starts empty and finishes empty after cleanout. The following weights are illustrative.

Batch entry

Net weight

How to record it

Runner scrap fed

100.0 kg

Granulation yield denominator

Approved PP regrind

96.0 kg

Granulation yield numerator

Fines rejected

2.0 kg

Weighed in a separate container

Oversize held for rework

1.0 kg

Weighed and tagged for review

Quality samples removed

0.5 kg

Counted once, outside approved weight

Cleanout residue rejected

0.3 kg

Weighed separately from fines

Total accounted output

99.8 kg

Sum of the five output categories

Unexplained difference

0.2 kg

Feed weight minus accounted output

The granulation yield is 96.0%. If you measure recovery across sorting and granulation together, divide 96.0 kg by the 104.0 kg received. That gives 92.3% incoming-lot recovery. For a run with material left in the system, add opening inventory to input and closing inventory to accounted output when checking the balance. Keep a shift-level yield provisional if some of that shift’s output remains in the system. Close the final yield when the full lot has been weighed and classified.

Use a Weight Log That Balances by Shift

Give each weighed container a unique ID. Record its gross and tare weights alongside the net figure. Mark the time and scale used so the next shift can tell when a container entered the record. Put fines, samples, and held oversize on separate lines. If the scale rounds to a given increment, carry that same precision through the reported weights. Use an agreed reconciliation tolerance based on the weighing setup and the size of the lot.

Review material still inside the equipment at the end of the test. If 1.5 kg remains and belongs to the same lot, list it under closing inventory until it is weighed out and classified. When it moves into another shift’s record, enter the matching opening inventory. Check transfer tickets when containers move between machines. Use the same lot ID on both sides of the movement. This is especially helpful when a central granulator serves several presses and finished regrind spends part of a shift in a transfer bin. At closeout, the original lot record should show where the accepted, held, rejected, and sampled material went. A supervisor can then compare the expected and recorded totals without reconstructing the entire shift.

Investigate a Gap Before Closing the Lot

When the weight difference exceeds your plant’s agreed tolerance, check scale zero, bin tares, transfers, and test samples first. Review material remaining in the hopper or conveying system. Check whether the dust collection container received material from another job. Record what you can verify and retain any remaining difference as unaccounted mass. That figure alone cannot tell you how much was lost as dust.

If clean oversize goes through a second pass, log first-pass yield before rework. Move the newly approved mass from the held category to the approved category once it passes inspection. Keep the original feed weight for the final lot yield. Record the second-pass feed separately when tracking machine workload or throughput.

Specify a Runner Trial Before Buying

When comparing equipment, send representative runners with their dimensions, PP grade, expected hourly feed, and target flake size. Ask each supplier to report approved kilograms, fines, rejects, and elapsed time on the same basis. Then compare accepted kg/h alongside yield. A machine can recover a high percentage of feed while processing too little to keep up with the molding cell.

For broader PP scrap projects, JWELL lists PP among the materials for its DYPS-T tray and plate plastic crusher. Its feed design is intended for items such as pallets and construction templates. Use the actual runner geometry to check suitability for your work. Ask for separate trials if the project also handles bulky tray scrap. Keep the yield figures specific to each feed shape.

Record the disposition of material that leaves the planned reuse route. For example, a batch approved for a lower-specification job may still have value to the plant. Log that value separately from the yield for the original molding job. If flakes are later returned to the approved stream after another test, keep the original hold decision and add the date of release. That history explains differences between the preliminary figure on a shift report and the final figure in the lot record.

Compare Two Trials Using the Same Clock

Report the trial duration with the final approved weight. Calculate accepted kilograms per hour over an agreed elapsed period. If one report excludes stoppages and another counts them, present the steady running rate and the elapsed-time rate separately. Include a tally of interruptions, feed shortages, and rework passes. Buyers can then see whether a high yield came from stable production or from a slower test with additional handling.

For example, two trials can both yield 96 kg from 100 kg of fed runners. If one takes 30 minutes and the other takes 40, the accepted output rates are 192 kg/h and 144 kg/h over the specified periods. Those figures can guide a capacity decision when the trials use the same material and release criteria. If the plant will feed several presses, ask the supplier to test a run that reflects the normal mix of runner shapes and delivery intervals. Keep the results for each job visible if grade or color must remain separate. Add the trial weights, quality releases, and elapsed time to the quotation record so the plant can repeat the check during commissioning.

Conclusion

Record how much PP runner scrap entered the machine, how much passed inspection, and where the rest went.

Use the original feed weight for final lot yield. Track rework separately so each kilogram counts once.

FAQ

Q: What should a plastic granulator machine use as its yield denominator?

A: Use the net weight actually fed into the plastic granulator machine after sorting and after deducting any unprocessed returns.

Q: Do fines count toward approved PP regrind yield?

A: Include them only if they meet the reuse specification. Weigh rejected fines separately when reconciling the lot.

Q: Can a plastic granulator machine show yield automatically?

A: A plastic granulator machine can report yield when the system captures net feed weights, output weights, and quality release decisions.

Q: Is regrind yield the same as regrind content?

A: No. Yield measures approved output per kilogram fed. Regrind content measures the regrind share of the final material blend.

Table of Content list
Related Products
Related News
+86-137-7300-0606
Email: salbl@jwell.cn
Address: No.118,shangshang road,kunlun street,liyang city,changzhou city,Jiangsu province,China

PRODUCT CATEGORY

Leave a Message
Keep In Touch With Us
Keep In Touch With Us
Copyright © 2024 Changzhou Dyun Environmental Technology Co., Ltd. All Rights Reserved. Sitemap | Privacy Policy